English
العربية
Français
Español
日本語
Melayu

Read the latest news from the EMAX Load Bank team

  • All generators have to have a 4-hour load test once every 3 years. This 4-hour load test must operate the generator at least 30% of the nameplate rating for 4 continuous hours, which again it appears you can meet without any difficulty.
  • In today’s fast-paced technological landscape, ensuring the reliability and efficiency of power systems is paramount. Load bank solutions have emerged as a critical tool for industries relying on backup power sources, such as generators and uninterruptible power supplies (UPS). These solutions not o
  • Load banks are essential tools in commercial buildings for various reasons, primarily related to maintaining and testing power systems to ensure reliability and efficiency.
  • In today's rapidly evolving industrial landscape, maintaining the efficiency and reliability of power systems is more critical than ever.

Contact us

  +86-769-8831-6780
  +86-15099752515(Mr. Jiang)
   sales05@emaxgroups.com
    No. 94, Shangzha Road, Houjie Town, Dongguan, Guangdong

Send Us A Message

Copyright @ 2022 Guangdong Emax Electrical Co., Ltd. All Rights Reserved. Sitemap Support By Leadong Privacy Policy